Ground Busbar for subfeeds is always at bottom of section whether cable exit is from the top or bottom. The WaveStar Color Monitor also has a points list and can present a basic communication alarm for each device in its Modbus chain. In bottom entry, customer phase connections are made to the bottom of the main input circuit breaker. Alarms must be separately cleared on each device that has alarms. Authorized users can specify device names. Device screens form a looped chain. So for example, a relay can be programmed to turn on when a specific Building Alarm, such as a fire alarm, is received.
Uploader: | Nalmaran |
Date Added: | 10 August 2004 |
File Size: | 6.57 Mb |
Operating Systems: | Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X |
Downloads: | 78849 |
Price: | Free* [*Free Regsitration Required] |
Maintenance contracts are customizable to meet specific needs number of PM visits per year, scope of coverage e. Turn off sooftware Distribution Output Circuit Breakers feeding the equipment. PowerPak 2 Power Distribution Unit.
Class determines user privileges. The following are approximate PDU weights: The following items must be included in the inspection checklist: The Monitor must be restarted when Ethernet Settings change.
The bottom input power cable plate is solid and customers should make their own cutout s for cables or conduit. These warranties will not eoftware if adjustment, repair or parts replacement is required because of accident, neglect, misuse, secondary transportation or other causes other than ordinary use. Using controls requires user login with correct authorization.
PDI simplifies data center power management
Side Cars have leveling feet. Follow safe electrical work practices: It is used only with subfeeds. Wear suitable personal protective clothing and use protective equipment for performing mechanical and electrical installations.
Visually inspect for and remove any debris that may have fallen into the PDU during installation. The time server could be a dedicated time server possibly with a GPS receiver, a local computer running time server software, or a time server on the Internet.

Robust tool targets the electrical, telecommunications, and underground construction industries. Place the floor stand within the raised floor opening and bolt securely sofyware the subfloor. Clear all alarms on this device. Leave ample space for attaching and routing wires. Alarms can be read in two ways: The modem can be used to send a summary alarm to one or two specified destinations. Color Monitor - Power Distribution, Inc. Maximum altitude 10, ft. Swing Controls Compartment out to the right.
Other trademarks are held by their respective owners. Sequentially turn ON the distribution circuit breakers. Damage must be noted on the bill of lading.
Carefully cut the safety bands, making sure that they do not scrape the exterior of the unit or scratch the paint.
JCOMM - PDI - Power Distribution, Inc.
Severe or fatal injury can result from electrical shock during contact with high voltage conductors, monitoring PCBs, or similar equipment. Cables to transformer cables are below Ssoftware Input Circuit Breaker. Touch Save to save settings. PM Rev Release Date: So for example, a relay can be programmed to turn on when a specific Building Alarm, such as a softwae alarm, is received.
The customer has a choice of two 2 Contractor Boards, which act as an extension of the PDU M4G Board for making customer connections for remote control and monitoring: An authorized user can touch Reset to require the Hub to rebuild its device chain from scratch. The screen must be configured as shown.
Comments
Post a Comment